Documents

Letters During the Work

Edition of 15 November 2026

We send these letters during a stage and until the warranty ends. No signature needed. The rules are in the Terms of Work; the letters give your stage’s dates, amounts and facts.

Delivery and acceptance

Stage delivery

Subject: Stage “stage name” delivered: review until last review day

Hello name,

Today, date, we deliver stage “stage name” under Order No. number. Demo: call date and time; if no call, link to the demo recording.

What we deliver, and where: results, one line each, with a link

You review until last review day, including that day, against the criteria you confirmed on date of your “yes”: criteria list or link; key ones marked

If all is well, reply “accepted”. If you find a mismatch, write which criterion is not met and what you saw. You can send issues one by one, until the period ends. We note requests beyond the criteria separately, as new work.

We will remind you on reminder date. If you need more time, write “need more time” before the period ends: we add 7 days, once per stage, no reason needed.

If neither “accepted” nor an issue against the criteria arrives, despite the reminder, the stage counts as accepted after last review day: we send the acceptance letter. Balance: amount, €, “the invoice comes with that letter”; if paid 100% in advance, “none”.

We sent this to the email and messenger in the Order. Please reply “received”.

Gleb Menshov, Knott

Reminder 3 days before the review ends

Subject: Reminder: you review stage “stage name” until last day

Hello name,

last day, no earlier than day 3 after this letter is the last day of the “review” or “recheck” of stage “stage name”. We sent the “delivery letter”, “fix letter” or “reply to your issues” on date. if we remind you less than 3 days before the original end, “We are reminding you late, so the period moves: it ends 3 days after this letter.”; otherwise delete

From you so far: “nothing has arrived” or “issues of (dates): received”.

Until that date, you can reply “accepted” or write which criterion is not met and what you saw. There is one 7-day extension per stage: “write ‘need more time’ before the period ends” or “already used (date)”.

If neither “accepted” nor an issue against the criteria arrives, the stage counts as accepted after that date: we send the acceptance letter.

We sent this to the email and messenger in the Order. Please reply “received”.

Gleb Menshov, Knott

Reply to a request for an extension

Subject: 7 days added: review of stage “stage name” until new last day

Hello name,

On date of request, you asked for more time. We added 7 days: you review until new last day, including that day. We will remind you on reminder date.

There is one extension per stage; it is now used. Everything else is as in our letter of date of the delivery or fix letter: if neither “accepted” nor an issue against the criteria arrives by the new date, the stage counts as accepted.

Gleb Menshov, Knott

Reply to a request for an extension, if already used

Subject: Review period for stage “stage name” unchanged: until last day

Hello name,

This stage has already had its extension: we added 7 days on date. The period is unchanged: until last day, including that day.

Send what you have checked by that date: all of it goes on the list. What you find later, we fix under the warranty.

Gleb Menshov, Knott

Reply to your issues

Subject: Issues with stage “stage name”: “fixing by (date)”; if nothing to fix, “recheck until (date)”

Hello name,

“The review period ended (date)”, “The recheck period ended (date)” or “On (date), you wrote that you finished the review”. The list includes everything that arrived from you by that date.

Mismatches with the criteria, fixed free of charge: criterion number, what is not met, date of your message; if none, “none”

We will fix them by: date; if nothing to fix, “not needed”

We need from you to fix them: if nothing, “nothing”; otherwise what exactly, for which item, and: “If we do not have it by (date, in 14 days), we record this item in the acceptance letter as remaining work; if it comes later, we finish it free of charge.”

Checked, criterion met: criterion number and how to check; if none, “none”

Requests not in the criteria, noted separately: requests; if none, “none”. If you wish, we send an estimate: scope, price, timing.

If you disagree with where we put an item, tell us: we check it together on a call. If we still disagree on a key criterion, we suggest an independent developer.

if something to fix, “We will write when it is fixed: from that message, you have 7 days to recheck the fixes.”; if nothing to fix, “Nothing needs fixing, so the 7-day recheck runs from this letter: until (date), including that day; we will remind you on (date). If neither ‘accepted’ nor an issue against the criteria arrives, despite the reminder, the stage counts as accepted after that date: we send the acceptance letter. We sent this to the email and messenger in the Order; please reply ‘received’.”

What is found after last review day, we fix under the warranty.

Gleb Menshov, Knott

Fix letter

Subject: Issues with stage “stage name” fixed: recheck until last recheck day

Hello name,

Today, date, we fixed the mismatches from the list of date of our reply: criterion number, what we fixed, where to see it; on a separate line, what we could not fix after waiting on you for 14 days: “we record this in the acceptance letter as remaining work”

This is “the first fix”, “the second fix” or “the key function repair after two fixes”. You recheck the fixes until last recheck day, including that day. We will remind you on reminder date.

If all is well, reply “accepted”. If a criterion from the list is still not met, write what you saw. after the first fix, “Then we fix it again.”; after the second fix or the key function repair, “After this recheck, the stage is accepted: we record what remains in the acceptance letter and finish it free of charge. If a key function does not work, the stage is not accepted.”

If you find a new mismatch with the criteria, tell us too: we fix it under the warranty.

If neither “accepted” nor an issue against the criteria arrives, despite the reminder, the stage counts as accepted after last recheck day: we send the acceptance letter.

We sent this to the email and messenger in the Order. Please reply “received”.

Gleb Menshov, Knott

Dispute about a key criterion

Subject: Key criterion No. number of stage “stage name”: we suggest an independent developer

Hello name,

On date of the call, we checked criterion No. number together, “criterion, as in the specification or Order”, and did not agree. You see: what you saw, your words. We see: what we see and how to check it. The criterion is key, so a developer with no ties to you or us will check it.

Who we suggest

Developer Price of their work, € Conclusion by
name and a link about them; one row each amount date

Please choose one by date, 7 days from this letter, including that day. If you do not, we choose and tell you the same day.

The developer needs: access for the check, what and from whom; if nothing, “nothing”.

Who pays. We pay the developer. If we are right, we add their price to the balance invoiceif paid 100% in advance, “; there is no balance, so we send a separate invoice for it”. If you are right, we cover it.

Until the conclusion arrives, deadlines for this criterion stop, and the stage is not accepted. We forward you the conclusion the day we receive it: it settles the dispute. If the criterion is met, the dispute is closed. If not, we fix it as a mismatch, and the deadlines run on.

Gleb Menshov, Knott

Acceptance letter (acceptance certificate)

Subject: Stage “stage name” accepted on date: acceptance letter (acceptance certificate)

Hello name,

Stage “stage name” under Order No. number is accepted today, date. We are Individual Entrepreneur Gleb Menshov (Knott), ID 345858155. You are business name, as in the Order.

Delivered: date of the delivery letter.

Why accepted: one of: “you wrote ‘accepted’ (date)”; “you said ‘accepted’ on a call (date)”; “the review (or recheck) period ended (date), reminder sent (date), neither ‘accepted’ nor an issue against the criteria arrived”; “second fix (or key function repair) delivered (date), recheck ended (date)”; “disputed non-key criterion checked together on a call (date), we did not agree: your disagreement is recorded below”; “an independent developer checked the disputed key criterion (name, date): it is met”

Criteria

No. Criterion Key Result
number criterion, as in the specification or Order yes or no “met”, “remaining work” or “disputed”

Remaining work: criterion number, what exactly is not met, and target finish date; if we are waiting on you, what we need from you; if none, “nothing”

We finish this free of charge, even after the warranty, unless others have changed that code. It does not delay payment. If we cannot make the named date, we tell you in advance and name a new one.

What you disagree with: criterion number and your position, your words, then: “Your claims on these points remain”; if none, “none”

If we recorded something wrong, tell us and we will correct it; the payment and warranty dates stay the same.

What we handed over, and where: code, documentation, guide for working by hand, where the daily backup goes, access list, with links

Money and dates

Stage price: amount, €. Paid: amount, €, and date.

Balance: amount, €, and attached invoice number; if paid 100% in advance, “none”.

if an independent developer checked a key criterion and we were right, “Developer’s price: (amount), €; it is in the same invoice” or, if paid 100% in advance, “…; a separate invoice for it is attached (number)”; otherwise delete

Pay by: “(date), including that day”, 7 days from this letter; if nothing to pay, “not needed”.

Warranty until: “(date), including that day”, and its basis: “60 days after acceptance”, “day 30 of the season starting (date)” or “12 months after acceptance”; for a one-off fix, “30 days after acceptance”; plus the days we were late, if any. for a pilot or module, “14 days before this date, we will write about next steps.”; for a one-off fix, delete

Launch session for your team: on an agreed day, no later than 7 days after acceptance and full payment of the stage.

What we made for you under this stage becomes yours on the day it is fully paid.

This letter is the acceptance certificate; its PDF is attached. No signature needed.

Gleb Menshov, Knott

New work and what we agreed

Estimate for new work

Subject: Estimate: the request, briefly, price, €

Hello name,

On date, you asked: “the request, your words”.

This is new work: why: “it is not in the Order or the specification”; “it is in the Order under ‘Not included’”; “the warranty ended (date)”; “the cause is a change by others, a third-party service or an input error”. So we price it separately.

What we will do: results, one line each

Not included: points open to dispute

Our building blocks in this work: list; if none, “none”

How you will check: criteria with a “yes” or “no” answer; key ones marked

Price: amount, €, fixed. Payment: “100% in advance” (required if the price is under €1,000) or “half before the start, half within 7 days after acceptance”. You send this amount and pay your own bank’s charges; anything intermediary banks deduct is our loss. We do not charge VAT.

Timing: we deliver on date if you pay by date, 14 days from this letter; if you pay later, we agree a new date, and after date, 30 days from this letter, a new price too. If we do not agree, the Order ends and we refund what you paid within 7 days.

Warranty: for a module, “as for every stage; the acceptance letter names the last day”; for a one-off fix, “30 days after acceptance: if the same defect comes back, we fix it free of charge; we do not monitor the system in this period”

Differences from the Terms of Work: what exactly and why; if none, “none”

Reply “yes”: we send the invoice and start when payment arrives. With your “yes”, this letter becomes Order No. number for software development services. It has no specification: the criteria are above.

Contacts, bank accounts, season dates and withholding tax are as in Order No. 1; the differences above apply for this stage; the rest, as in the Terms of Work.

You can reply “not now”: we note it and come back when you say.

Gleb Menshov, Knott

Call summary

Subject: Call summary, date

Hello name,

We spoke today: who took part. Here is the summary, so we both have it.

We agreed: one line per decision

We do: what and by what date

We need from you: what and by what date

Discussed, not included in the stage: what exactly; if nothing, “nothing”

Changes to price, scope or timing: what it was and what it is now; if nothing, “nothing”

Anything in the last line applies after your “yes”: reply to this message.

If we recorded something wrong, tell us; we will correct it.

Gleb Menshov, Knott

Paying the balance

Reminder on day 1 of late payment

Subject: Balance for stage “stage name”: due on last payment day

Hello name,

Yesterday, last payment day, was the last day to pay the balance for stage “stage name”: amount, €, invoice No. number of date. We do not see the payment yet.

If you have already sent the transfer, tell us when: the payment date is the day you sent it, if it arrives. If you have invoice questions, write; we will answer.

We will remind you again on date, day 7 of late payment. If payment does not come, from date, day 14 of late payment we will suspend work for you, including fixes. We do not switch off the system or charge interest.

Gleb Menshov, Knott

Reminder on day 7 of late payment

Subject: Balance for stage “stage name” not paid: we suspend work from date, day 14 of late payment

Hello name,

The balance for stage “stage name”, amount, €, invoice No. number, is not paid. It was due on last payment day; we reminded you on date of the first reminder.

From date, day 14 of late payment, we suspend all our work for you: new tasks and any fixes, including those in the acceptance letter. We complete any support period already paid.

We do not switch off the system or charge interest. What we made for you under this stage becomes yours on the day of full payment; we hold the launch session after it.

If you have already sent the transfer, tell us when.

Gleb Menshov, Knott

Suspending work on day 14 of late payment

Subject: Work suspended: balance for stage “stage name” not paid

Hello name,

Today, date, we suspended work for you. The balance for stage “stage name”, amount, €, invoice No. number, is not paid; it was due on last payment day. We reminded you on dates of the two reminders.

We suspended all our work for you: new tasks and any fixes, including those in the acceptance letter. We complete any support period already paid.

Unchanged: we do not switch off the system, accounts and data stay with you, and we charge no interest.

Until the payment period ended, you could use what we made for you in your business; from now on, only after full payment. On that day, it becomes yours.

When payment arrives, we resume work and name the dates.

Gleb Menshov, Knott

Warranty

Reply to a defect report

Subject: Fixing free of charge: what does not work, briefly

Hello name,

On date, you wrote: “your message, your words”. This is “a defect under the warranty” or “part of the stage in the chosen option, but missing from the Order”: we fix it free of charge, no estimate needed.

We start on date; for a key function, no later than the next working day after your message; target finish date: date. We will write when it is fixed. If this is a key function, the repair days extend the warranty, except days we are waiting on you; that message names the new last warranty day.

Gleb Menshov, Knott

Letter 14 days before the warranty ends

Subject: Warranty on stage “stage name” until last warranty day

Hello name,

last warranty day is the last warranty day for stage “stage name”. If you report a mismatch with the criteria by that date, including that day, we fix it free of charge, even if we finish later.

if you already pay for support, instead of the rest: “You have support: after this date, we fix defects in this stage under it. No action needed.”

After that, you decide:

  • Support: €90 or €150 a month; what it includes and how to end it is on the attached “Support” page. For support to start right after the warranty, write to us and pay the first invoice by last warranty day, including that day. If you start later, the first 3 months are paid in one payment, €270 or €450: otherwise support could be bought for one month just for one repair. After a gap of more than 3 months, we first do a system check for €250. You can cancel on any day.
  • Without support: the system is yours and keeps working. You install security updates and monitor the system and the daily backup. A one-off fix is from €250.

No reply needed. Support does not start by itself: it needs your message and payment of the first invoice.

Gleb Menshov, Knott

Waiting, suspension, terminating a stage

These letters come only before delivery. After delivery, the review runs: waiting does not terminate a stage.

We are waiting on you

Subject: We are waiting on you: stage “stage name” has stalled

Hello name,

To continue stage “stage name”, we need from you: payment, access, data or a reply: what exactly and when we asked for it.

Work has stalled since date. The delivery date moves by as many days as we wait.

If we do not have it by date, 14 days from this letter, we suspend work at the end of that day and write to you.

At your request, we can suspend work for up to 60 days, once per stage, before delivery: “you can ask for this” or “already suspended (dates)”.

Gleb Menshov, Knott

Work suspended

Subject: Work on stage “stage name” suspended from date

Hello name,

Today, date, we suspended work on stage “stage name”. On date of the “We are waiting on you” letter, we wrote that we were waiting on you for what exactly, and it has not arrived.

Once we have it, we continue and name a new delivery date: the deadline moves by the waiting days plus up to 14 days.

If nothing changes, we warn you on date, 30 days from this letter and terminate the stage on date, 14 days after that. Money on termination: one of: “we keep half the price, (amount); you do not pay the other half, or get it back within 7 days”; before your ‘yes’ to the specification, “we keep the specification price, (amount), and refund the rest, (amount), within 7 days”; if no specification sent yet, “we refund all you paid, (amount), within 7 days”.

Gleb Menshov, Knott

Warning before terminating the stage

Subject: We terminate stage “stage name” on termination date unless we receive what exactly

Hello name,

Work on stage “stage name” has been suspended since date: we are waiting on you for what exactly. If we do not have it by termination date, we terminate the stage at the end of that day.

What happens on termination:

  • Money: one of: “we keep half the price, (amount); you do not pay the other half, or get it back within 7 days”; before your ‘yes’ to the specification, “we keep the specification price, (amount), and refund the rest, (amount), within 7 days”; if no specification sent yet, “we refund all you paid, (amount), within 7 days”.
  • You keep: the specification; what was done and where it is; if nothing was handed over, “nothing”.
  • You can keep the work done by making an additional payment to reach the price share equal to the share of criteria met. Met so far: “(N) of (M)”, criterion numbers; if none, “none”. Price share: stage price × N / M, €.
  • For 6 months after termination, you can continue the stage with a new Order; what you paid counts.

To avoid termination, send what exactly. At your request, we can suspend work for up to 60 days, once per stage: “you can ask for this” or “already suspended (dates)”.

Gleb Menshov, Knott

Terminating the stage

Subject: Stage “stage name” terminated on date

Hello name,

Today, date, we terminated stage “stage name” under Order No. number. We had been waiting on you for what exactly since date of the “We are waiting on you” letter; we wrote about the suspension on date and warned you on date.

Money. Paid: amount, €. We keep: amount, €, and what for: half the price or the specification price; if no specification sent, “nothing”. We refund: amount, €, and date, 7 days from this letter; if nothing to refund, “nothing”, to the account the money came from. You do not pay the balance.

You keep: the specification; what was done and where it is; if nothing was handed over, “nothing”.

If you want to keep the work done. You pay the price share equal to the share of criteria met. Met: “(N) of (M)”, criterion numbers; if none, “none”. Price share: stage price × N / M, €. What we kept counts towards it. Additional payment beyond that: the difference, €, “after it, the work done becomes yours”; if no difference, “not needed: the work done is already yours”. If you disagree that a criterion is met, we check it together, as during acceptance.

You can continue the stage until date, 6 months from this letter: with a new Order, in our next free slot. What you paid counts.

Gleb Menshov, Knott

Suspension at your request

Subject: Work suspended at your request: stage “stage name”, until last day

Hello name,

On date of request, you asked us to suspend work. Work on stage “stage name” is suspended from date to last day, no more than 60 days later, including that day. This is possible once per stage, before delivery.

Your payments still count. When you are ready to continue, write to us, and we name a new delivery date: the deadline moves by the days of suspension plus up to 14 days.

If you have not written by last day that you are ready, we are waiting on you from that day: we warn you on warning date, 14 plus 30 days after that last day and terminate the stage on termination date, 14 days after that.

Gleb Menshov, Knott

If we are late

We are late with delivery

Subject: Delivery of stage “stage name” is late: new date new delivery date

Hello name,

We cannot deliver stage “stage name” by delivery date in the Order; if moved by days of waiting, the moved date. The reason: one sentence.

What we propose. We deliver on new delivery date, number days later. The warranty grows by the same number of days. Already handed over under the stage: what and where: specification, code in your repository; which of it works.

Your rights. If we have not delivered by date, day 14 of our lateness, including that day, you can terminate the stage from the next day with one message, until we deliver it. You then do not pay the balance. You decide whether to keep the work done under the stage, including the code:

  • If you keep the work done, it becomes yours on the day of termination; we keep half the price, amount, €, and you do not pay the other half, or get it back within 7 days.
  • If you reject it, within 14 days of termination you write that you use nothing done under the stage: it stays ours. Within 7 days of that message, we refund amount, €, and calculation: all you paid except the price of the specification received; if no specification received, all you paid to the account the money came from.

If we deliver before you write about termination, the usual review runs.

Gleb Menshov, Knott

We did not fix a key function

Subject: Key function of stage “stage name” not fixed: you decide

Hello name,

On date, you wrote that after two fixes a key function does not work: criterion number and what you saw. We did not fix it within 7 days, by date, including that day. The reason: one sentence.

Your rights. From today, you can terminate the stage with one message, until you accept it. You then do not pay the balance. You decide whether to keep the work done under the stage, including the code:

  • If you keep the work done, it becomes yours on the day of termination; we keep half the price, amount, €, and you do not pay the other half, or get it back within 7 days.
  • If you reject it, within 14 days of termination you write that you use nothing done under the stage: it stays ours. Within 7 days of that message, we refund amount, €, and calculation: all you paid except the price of the specification received; if no specification received, all you paid to the account the money came from.

You do not have to terminate it. “We keep repairing it; target finish date: (date). We will write when it is fixed: from that message, you have 7 days to recheck.” or “We cannot fix this: (why, one sentence).” You can also accept the stage: reply “accepted”. We record the function in the acceptance letter as remaining work; the balance and the warranty are as usual.

If you neither terminate nor accept the stage by date, 14 days from this letter, including that day, we can terminate it after that date. The money is the same; you decide whether to keep the work done. If we terminate it, we tell you the same day.

Gleb Menshov, Knott